{"id":50,"date":"2023-02-20T17:23:41","date_gmt":"2023-02-20T17:23:41","guid":{"rendered":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/?page_id=50"},"modified":"2025-09-04T18:24:13","modified_gmt":"2025-09-04T18:24:13","slug":"electric-vehicles","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/transportation\/electric-vehicles\/","title":{"rendered":"Electric Vehicles"},"content":{"rendered":"<p>Charging Stations for plug-in electric vehicles (PEVs) are available at all <a rel=\"noreferrer noopener\" href=\"https:\/\/www.austincc.edu\/locations\/campuses\" target=\"_blank\">ACC campuses<\/a>.<\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"wp-block-heading\">Using Charging Stations on ACC campuses:<\/h2>\n<p>ACC provides an affordable EV charging rate($0.05\/kWh) exclusively for ACC students and employees. The discounted rate is valid as long as you are employed at ACC or actively enrolled during the semester.<\/p>\n<p><strong>Steps to Get Started:<\/strong><\/p>\n<\/div>\n<\/div>\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Register for the ACC Charging Rate<\/strong><br \/><a href=\"https:\/\/green.apps.austincc.edu\/electricVehicle\" data-type=\"link\" data-id=\"https:\/\/docs.google.com\/forms\/d\/e\/1FAIpQLScQgbNZl8fJZ5itESbiaa0-mMKL-dCJDlzhB0VABer0quAFaA\/viewform\">Sustainable Transportation Portal<\/a>, once you are approved, you will receive a link to get connected.<\/li>\n<li><strong>Locate Charging Stations<\/strong><br \/>Use the campus maps linked below to find the nearest charging stations.<\/li>\n<li><strong>Follow Charging Instructions<\/strong><br \/>Follow the charging and payment instructions displayed on the station.<\/li>\n<\/ol>\n<p><strong>Important Information:<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li>Charging sessions are limited to <strong>4 hours<\/strong> at a time. <strong>Overnight charging is not permitted.<\/strong><\/li>\n<\/ul>\n<p><strong>Payment Options:<\/strong><br \/>Payments are processed through the ChargePoint payment portal using your pre-registered payment method.<\/p>\n<ul class=\"wp-block-list\">\n<li><strong>ACC Rate:<\/strong> Discounted rates are available for registered students and employees.<\/li>\n<li><strong>Non-ACC Rate:<\/strong> Charging costs $2 per hour and can be paid using a credit card.<\/li>\n<\/ul>\n<p>If you have any questions or need assistance, please email us at <strong>EV@austincc.edu<\/strong>.<\/p>\n<p>Thank you for supporting sustainability at ACC!<\/p>\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n<\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Who is eligible to use Electric Vehicle Charging Stations at ACC?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>Active ACC students and employees can register for the ACC-only discounted rate. Anyone with an electric vehicle may use ACC\u2019s Charging Stations with a credit card payment.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">How do I pay?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>For a credit card payment, call toll-free 888-758-4389 or visit chargepoint.com to pay. Other payment options include using any smart (RFID) credit\/debit card to authorize a session.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Is there a ChargePoint mobile app?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>There is a ChargePoint app available for <a rel=\"noreferrer noopener\" href=\"https:\/\/itunes.apple.com\/us\/app\/chargepoint\/id356866743?mt=8\" target=\"_blank\">iOS<\/a> and <a rel=\"noreferrer noopener\" href=\"https:\/\/market.android.com\/details?id=com.coulombtech&amp;hl=en\" target=\"_blank\">Android<\/a> phones. <\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Are Charging Stations accessible, following the American Disability Act?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>Yes, one station is located at an accessible parking space per campus.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Do charging stations work with any electric vehicle?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>The ChargePoint networked charging stations at ACC will work with most electric vehicles on the market. ACC supplies (SAE J1772\u2122) level 2 charging connectors.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">How long will it take to charge my electric vehicle?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>This depends on the type of vehicle. A completely drained Nissan Leaf will take up to 8 hours with a level 2 charger. A Chevy Volt will take less time due to its smaller battery capacity.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Where can I charge my electric vehicle when I am not at ACC?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>Many ChargePoint EV Charging Stations can be found around the Greater Austin Area and <a href=\"https:\/\/na.chargepoint.com\/charge_point\" target=\"_blank\" rel=\"noreferrer noopener\">throughout the United States<\/a>. Also growing number of DC fast chargers are being installed, including Tesla Superchargers.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<p><div class=\"list\"><p class=\"trigger\"><a href=\"#\">What if I have more questions about charging stations?<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<p>Call toll-free 888-758-4389 or visit\u00a0<a href=\"https:\/\/www.chargepoint.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">chargepoint.com<\/a>\u00a0with further questions, or email us at ev@austincc.edu for ACC&#8217;s EV charging program inquiries.<\/p>\n<p><\/div><\/div><\/div><\/p>\n<h2 class=\"wp-block-heading\"><\/h2>\n<h3 class=\"wp-block-heading\">EV Charging Station Maps<\/h3>\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/drive.google.com\/open?id=17omAAR5lvLO-Nn5-joqkkpWkIPs&amp;usp=sharing\" target=\"_blank\" rel=\"noreferrer noopener\">Cypress Creek Campus<\/a><\/li>\n<li><a href=\"https:\/\/www.google.com\/maps\/d\/viewer?ll=30.267595%2C-97.706963&amp;spn=0.001564%2C0.002151&amp;msa=0&amp;mid=1NMKrA7KRlIi636LSFtbnXXZNC5s\" target=\"_blank\" rel=\"noreferrer noopener\">Eastview Campus<\/a><\/li>\n<li><a href=\"https:\/\/www.google.com\/maps\/d\/u\/0\/edit?hl=en&amp;authuser=0&amp;mid=zXuyw73reyUA.k1xrNOHtZ3U8\" target=\"_blank\" rel=\"noreferrer noopener\">Elgin Campus<\/a><\/li>\n<li><a href=\"https:\/\/www.google.com\/maps\/d\/edit?hl=en&amp;authuser=0&amp;mid=1G1QBmoJMc1jtv9M8j_GGUlJZjek&amp;ll=30.027081004044163%2C-97.8708759439179&amp;z=20\" target=\"_blank\" rel=\"noreferrer noopener\">Hays Campus<\/a><\/li>\n<li><a rel=\"noreferrer noopener\" href=\"https:\/\/maps.google.com\/maps\/ms?msid=215249066112690109362.0004b5a5b62de3907d1c9&amp;msa=0&amp;ll=30.322812,-97.712255&amp;spn=0.000781,0.001076\" target=\"_blank\">Highland Business Center<\/a><\/li>\n<li><a href=\"https:\/\/www.google.com\/maps\/d\/u\/0\/edit?mid=1PLUZDY-3Ra_DIF_Ghw6o0B3oPwUKbIY&amp;usp=sharing\" target=\"_blank\" rel=\"noreferrer noopener\">Highland Campus<\/a><\/li>\n<li><a href=\"https:\/\/www.google.com\/maps\/d\/u\/0\/edit?mid=1O3lm-FB8WeZ1NclW1E-SDh4BVns&amp;usp=sharing\" target=\"_blank\" rel=\"noreferrer noopener\">Northridge Campus<\/a><\/li>\n<li><a href=\"https:\/\/www.google.com\/maps\/d\/u\/0\/edit?mid=1P10nBN_TJ2cPQ6cELDApcAthpb4&amp;usp=sharing\" target=\"_blank\" rel=\"noreferrer noopener\">Rio Grande Campus<\/a><\/li>\n<li><a href=\"https:\/\/maps.google.com\/maps\/ms?msid=215249066112690109362.0004b5a4e7e56ddf0d991&amp;msa=0&amp;ll=30.236146,-97.704927&amp;spn=0.002212,0.002151\" target=\"_blank\" rel=\"noreferrer noopener\">Riverside Campus<\/a><\/li>\n<li><a href=\"https:\/\/maps.google.com\/maps\/ms?msid=215249066112690109362.0004b5a6addc7d6aa4bc2&amp;msa=0&amp;ll=30.562529,-97.657063&amp;spn=0.003118,0.004302\" target=\"_blank\" rel=\"noreferrer noopener\">Round Rock Campus<\/a><\/li>\n<li><a rel=\"noreferrer noopener\" href=\"https:\/\/www.google.com\/maps\/d\/viewer?hl=en&amp;mid=10qNdZRsEnPaTLZgL_H74hdJpXhXLXAmX&amp;ll=30.587476400440103%2C-97.84949410000002&amp;z=20\" target=\"_blank\">San Gabriel Campus<\/a><\/li>\n<li><a href=\"https:\/\/maps.google.com\/maps\/ms?msid=215249066112690109362.0004b5a4cc43cfe015142&amp;msa=0&amp;ll=30.215814,-97.795633&amp;spn=0.000391,0.000538\" target=\"_blank\" rel=\"noreferrer noopener\">South Austin Campus<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Charging Stations for plug-in electric vehicles (PEVs) are available at all ACC campuses. Using Charging Stations on ACC campuses: ACC provides an affordable EV charging rate($0.05\/kWh) exclusively for ACC students and employees. The discounted rate &hellip; <a href=\"https:\/\/offices.austincc.edu\/energy-and-sustainability\/transportation\/electric-vehicles\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":224,"parent":35,"menu_order":-35,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-50","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/pages\/50","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/comments?post=50"}],"version-history":[{"count":0,"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/pages\/50\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/pages\/35"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/media\/224"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/energy-and-sustainability\/wp-json\/wp\/v2\/media?parent=50"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}