{"id":9,"date":"2023-10-30T14:01:38","date_gmt":"2023-10-30T14:01:38","guid":{"rendered":"https:\/\/offices.austincc.edu\/facilities-and-construction\/?page_id=9"},"modified":"2025-10-27T18:19:41","modified_gmt":"2025-10-27T18:19:41","slug":"facilities-construction","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/","title":{"rendered":"Campus Planning, Construction &amp; Sustainability"},"content":{"rendered":"<p>Campus Planning, Construction &amp; Sustainability works to ensure that ACC\u2019s physical environments best support the College\u2019s mission of excellence in teaching and workforce preparation. Utilizing the highest standards of integrity and professional expertise in an accessible, environmentally and fiscally sustainable manner, Campus Planning, Construction &amp; Sustainability provides:<\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Campus Planning<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/campus-planning\/master-planning\/\" data-type=\"page\" data-id=\"15\">Master Planning<\/a><\/h3>\n<p>District-wide campus planning to align with ACC&#8217;s strategic and academic missions. Input of departmental stakeholders, advisory committees, and the ACC Board of Trustees is integral to this process.<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/campus-planning\/project-planning\/\" data-type=\"page\" data-id=\"20\">Project Planning<\/a><\/h3>\n<p>Feasibility studies provide program, budget, zoning, and code analysis, as well as environmental and physical property&nbsp;assessments.<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/campus-planning\/real-estate-land-acquisition\/\" data-type=\"page\" data-id=\"22\">Real Estate and Land Acquisition<\/a><\/h3>\n<p>Evaluates potential real estate purchases and handles rental payments for leased spaces.<\/p>\n<\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Energy &amp; Sustainability<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/energy-sustainability\/\" data-type=\"page\" data-id=\"17\">Energy &amp; Sustainability<\/a><\/h3>\n<p>ACC is committed to becoming a leader in sustainability. ACC\u2019s Office of Energy &amp; Sustainability hosts sustainable initiatives designed to shrink the college\u2019s ecological footprint and increase environmental awareness.<\/p>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Facilities Information Systems (FIS)<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/facilities-document-management\/\" data-type=\"page\" data-id=\"26\">Facilities Document Management<\/a><\/h3>\n<p>Archival of project construction files and drawings.&nbsp; Management of building floor plans and access through Box.<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/geographic-information-system-gis-mapping\/\" data-type=\"link\" data-id=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/geographic-information-system-gis-mapping\/\">Geographic Information System (GIS) Mapping<\/a><\/h3>\n<p>Development of district basemap and base layers for department overlays.&nbsp; Maintains access control for GIS licenses in the college.&nbsp; Development of wayfinding apps and campus information maps.<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/space-accounting\/\" data-type=\"link\" data-id=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/space-accounting\/\">Space Accounting<\/a><\/h3>\n<p>Database of floor plans and square footages for all campuses. Additionally, we&nbsp;do room numbering, development of Emergency Evacuation Plans, and Campus Walking Maps.<\/p>\n<\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Project Management<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/project-management\/capital-projects\/\" data-type=\"page\" data-id=\"32\">Capital Projects<\/a><\/h3>\n<p>Project&nbsp; budgeting, scheduling, design and construction integrity ensure that the College receives the highest quality facilities that adhere to&nbsp;College, Board of Trustees,&nbsp;and industry standards. Projects range from minimal repairs to the creation of multi-million-dollar new campuses.&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/project-management\/commissioning\/\">Commissioning &amp; Engineering<\/a><\/h3>\n<p>Commissioning (Cx) is a systematic process of assuring by verification and documentation, from the Design Phase throughout Operation Phase, that the building system(s) perform interactively in accordance with the design documentation and intention, based on the Owner&#8217;s operational needs.<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/furniture-fixtures-equipment\/\" data-type=\"link\" data-id=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/furniture-fixtures-equipment\/\">Furniture, Fixtures &amp; Equipment (FF&amp;E)<\/a><\/h3>\n<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/in-house-construction\/\" data-type=\"link\" data-id=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-admin\/post.php?post=494&amp;action=edit\">In-House Construction<\/a><\/h3>\n<p>Painters, Carpenters<\/p>\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/signage\/\" data-type=\"link\" data-id=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/signage\/\">Signage<\/a><\/h3>\n<p>Signage updates &#8211; room signs, directories, etc.<\/p>\n<\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-scaled.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"165\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-1024x683.jpg\" alt=\"\" class=\"wp-image-165\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-1024x683.jpg 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-300x200.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-768x512.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-1536x1024.jpg 1536w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-2048x1365.jpg 2048w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/leanderFINAL01-2-150x100.jpg 150w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-scaled.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"166\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-1024x576.jpg\" alt=\"\" class=\"wp-image-166\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-1024x576.jpg 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-300x169.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-768x432.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-1536x864.jpg 1536w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-2048x1152.jpg 2048w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-150x84.jpg 150w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/RGC-drone-DJI_0794-smaller-320x180.jpg 320w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"511\" data-id=\"164\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller-1024x511.jpg\" alt=\"\" class=\"wp-image-164\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller-1024x511.jpg 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller-300x150.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller-768x383.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller-1536x766.jpg 1536w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller-150x75.jpg 150w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/New-District-Map-Purple-smaller.jpg 1823w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-scaled.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"167\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-1024x683.jpg\" alt=\"\" class=\"wp-image-167\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-1024x683.jpg 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-300x200.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-768x512.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-1536x1024.jpg 1536w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-2048x1365.jpg 2048w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Round-Rock-Phase-II-IMG_4090-2-150x100.jpg 150w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Campus Planning, Construction &amp; Sustainability works to ensure that ACC\u2019s physical environments best support the College\u2019s mission of excellence in teaching and workforce preparation. Utilizing the highest standards of integrity and professional expertise in an &hellip; <a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":-50,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-9","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/9","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/comments?post=9"}],"version-history":[{"count":0,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/9\/revisions"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/media?parent=9"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}