{"id":494,"date":"2025-10-09T16:23:02","date_gmt":"2025-10-09T16:23:02","guid":{"rendered":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/?page_id=494"},"modified":"2026-11-06T18:58:02","modified_gmt":"2026-11-06T18:58:02","slug":"in-house-construction","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/in-house-construction\/","title":{"rendered":"In-House Construction"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Carpentry Shop<\/h2>\n<p class=\"wp-block-paragraph\">The Carpentry Shop is responsible for routine and specialty requested carpentry jobs and projects such as wood repair, cabinets, walls, classroom fixtures, built-in countertops, doors, door jambs, door frames, baseboards, flooring, ceiling grids, and custom cabintry. Availability is based on current workload. Work orders are processed and prioritized in the order they are received.<\/p>\n<h2 class=\"wp-block-heading\">Paint Shop<\/h2>\n<p class=\"wp-block-paragraph\">The Paint Shop is responsible for the surface finishing and protective coating needs of the college. Routine and specialty requested paint jobs and projects include patching, painting, touch-ups, interior and exterior painting of walls and surfaces. Availability is based on current workload. Work orders are processed and prioritized in the order they are received.<\/p>\n<h2 class=\"wp-block-heading\">Submit Request<\/h2>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/austincc.request.services\/Requests\/Login?RegistrationCode=25900c2c-3e88-4991-a828-3498e0de9114\" target=\"_blank\" rel=\"noopener\">MicroMain<\/a>&nbsp;(For Carpentry, Paint, Signage)<\/p>\n<p class=\"wp-block-paragraph\">\n","protected":false},"excerpt":{"rendered":"<p>Carpentry Shop The Carpentry Shop is responsible for routine and specialty requested carpentry jobs and projects such as wood repair, cabinets, walls, classroom fixtures, built-in countertops, doors, door jambs, door frames, baseboards, flooring, ceiling grids, &hellip; <a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/in-house-construction\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-494","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/comments?post=494"}],"version-history":[{"count":3,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/494\/revisions"}],"predecessor-version":[{"id":798,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/494\/revisions\/798"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/media?parent=494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}