{"id":32,"date":"2023-10-30T18:18:44","date_gmt":"2023-10-30T18:18:44","guid":{"rendered":"https:\/\/offices.austincc.edu\/facilities-and-construction\/?page_id=32"},"modified":"2025-09-18T19:15:57","modified_gmt":"2025-09-18T19:15:57","slug":"capital-projects","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/project-management\/capital-projects\/","title":{"rendered":"Capital Projects"},"content":{"rendered":"<p><strong>Campus Planning, Construction &amp; Sustainability<\/strong>\u00a0provides consultation, programming, design, estimating, bid assistance, and full project and construction management for the following types of projects:<\/p>\n<ul class=\"wp-block-list\">\n<li><strong>Renovations<\/strong>&nbsp;&#8211; Equipment Upgrades, Interior Finish Refurbishment, Office, Classroom, and Lab Reconfigurations, Special Occupancy Alterations, i.e. Auto-Tech and Welding, Roofing Repairs and Replacements, Modernization of Common Spaces, Exterior Building Enhancement, Sitework and Landscaping Revisions, and Major Re-Designs of New Acquisitions&nbsp;<\/li>\n<li><strong>New Building Construction<\/strong>&nbsp;&#8211; Cypress Creek Campus, Elgin Campus, Eastview Campus, Hays Campus, Northridge Campus, Riverside Campus, Round Rock Campus, South Austin Campus, San Gabriel Campus, and campus-related Parking Garages&nbsp;<\/li>\n<li><strong>Infrastructure &amp; Life Safety Upgrades<\/strong>&nbsp;&#8211; HVAC, Fire Alarm, Sprinkler, Emergency Notification, Interior and Exterior Lighting, Internet, Power, Gas,&nbsp; Water, Sewer, and&nbsp; Storm Drainage System Modifications&nbsp;&nbsp;<\/li>\n<li><strong>Accessibility &amp; Building Code Upgrades<\/strong>&nbsp; &#8211; Restroom ADA upgrade&nbsp;<\/li>\n<\/ul>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"653\" data-id=\"229\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287-1024x653.jpg\" alt=\"\" class=\"wp-image-229\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287-1024x653.jpg 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287-300x191.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287-768x490.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287-1536x980.jpg 1536w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287-150x96.jpg 150w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/ACC_Highland_ext_206287.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/DB_07808-2.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"600\" data-id=\"228\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/DB_07808-2.jpg\" alt=\"\" class=\"wp-image-228\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/DB_07808-2.jpg 900w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/DB_07808-2-300x200.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/DB_07808-2-768x512.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/DB_07808-2-150x100.jpg 150w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/a><\/figure>\n<\/figure>\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/drive.google.com\/drive\/folders\/17NGEJvFegIjr1zZgqo6lLJ-JdLxVhvaF\" target=\"_blank\" rel=\"noreferrer noopener\">Portfolio<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Campus Planning, Construction &amp; Sustainability\u00a0provides consultation, programming, design, estimating, bid assistance, and full project and construction management for the following types of projects:<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":75,"menu_order":-20,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-32","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/32","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/comments?post=32"}],"version-history":[{"count":0,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/32\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/75"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/media?parent=32"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}