{"id":30,"date":"2023-10-30T14:09:06","date_gmt":"2023-10-30T14:09:06","guid":{"rendered":"https:\/\/offices.austincc.edu\/facilities-and-construction\/?page_id=30"},"modified":"2025-09-18T19:07:27","modified_gmt":"2025-09-18T19:07:27","slug":"space-accounting","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/space-accounting\/","title":{"rendered":"Space Accounting"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"512\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/10\/space1-1024x512.png\" alt=\"\" class=\"wp-image-130\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/10\/space1-1024x512.png 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/10\/space1-300x150.png 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/10\/space1-768x384.png 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/10\/space1-150x75.png 150w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/10\/space1.png 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<p>Campus Planning, Construction &amp; Sustainability is responsible for the maintenance of floor plans and square footage calculations for our 3.6 Million square feet, made up of 11 campuses and over 60 buildings. In order to have current information, walkthroughs are done periodically to note any space changes. Square footage calculations are also done for various reports for different departments throughout the college. Additionally, we develop and maintain Building Directory Department Floors Plans, Emergency Evacuation Plans, and Campus Walking Maps.<\/p>\n<p>If you find that there is a discrepancy in a floor plan, please contact us so we can come out and make any adjustments needed.<\/p>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-text-align-center wp-element-button\" href=\"https:\/\/forms.gle\/9GaE5yDuDGFv82GXA\" target=\"_blank\" rel=\"noreferrer noopener\">FIS Request Form<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Campus Planning, Construction &amp; Sustainability is responsible for the maintenance of floor plans and square footage calculations for our 3.6 Million square feet, made up of 11 campuses and over 60 buildings. In order to &hellip; <a href=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/facilities-information-systems-fis\/space-accounting\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":72,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-30","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/comments?post=30"}],"version-history":[{"count":0,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/30\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/72"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/media?parent=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}