{"id":24,"date":"2023-10-30T14:17:00","date_gmt":"2023-10-30T14:17:00","guid":{"rendered":"https:\/\/offices.austincc.edu\/facilities-and-construction\/?page_id=24"},"modified":"2026-02-06T19:59:11","modified_gmt":"2026-02-06T19:59:11","slug":"design-guidelines-construction-standards","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/campus-planning\/design-guidelines-construction-standards\/","title":{"rendered":"Design Guidelines &amp; Construction Standards"},"content":{"rendered":"<p>ACC Design Guidelines and Construction Standards have been created as the foundation for the design, construction, operation, renovation, modification and general care of our facilities at Austin Community College District (ACC).&nbsp;<\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Process<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p>Our Facilities and Construction department is responsible for gathering and maintaining these design guidelines to ensure consistent and efficient development, construction and maintenance of our campus&#8217;s infrastructure.&nbsp; Here is a breakdown of how our department carries out this responsibility:<\/p>\n<ol class=\"wp-block-list\">\n<li><strong>Gathering Information:<\/strong><br \/>The process starts with gathering information from various sources, including industry standards, regulatory requirements, architectural trends, sustainability practices, and the college&#8217;s specific needs and goals from our IT, Safety and Operation departments. This information forms the foundation for creating comprehensive design guidelines.<\/li>\n<li><strong>Internal Collaboration:<\/strong><br \/>Our F&amp;C department collaborates closely with various stakeholders within the college community, including administrators, faculty, and staff. Input from these groups helps shape the guidelines to align with the college&#8217;s mission, values, and educational objectives.<\/li>\n<li><strong>Developing Guidelines:<\/strong><br \/>The gathered information is used to develop detailed design guidelines covering various aspects of campus development, including architecture, landscaping, accessibility, energy efficiency, materials selection, safety, and more. These guidelines ensure that all future construction and renovation projects adhere to a consistent set of standards.<\/li>\n<li><strong>Review and Approval:<\/strong><br \/>Before finalizing the guidelines, they undergo a rigorous review process involving architects, engineers, sustainability experts, and other relevant professionals, including ACC Administration. This review helps identify potential issues and areas for improvement, ensuring that the guidelines are comprehensive and accurate.<\/li>\n<li><strong>Documenting Guidelines:<\/strong><br \/>Once approved, the guidelines are documented in a comprehensive manual or digital format. This manual includes detailed descriptions, diagrams, forms and specifications for various design elements. It serves as a reference for architects, contractors, and other parties involved in campus development projects.<\/li>\n<li><strong>Regular Updates:<\/strong><br \/>Design guidelines are not static; they need to evolve to incorporate new technologies, best practices, and changing needs. Our department is under the process of establishing a process for regular updates to ensure that the guidelines remain current and effective over time.<\/li>\n<li><strong>Dissemination and Training:<\/strong><br \/>Once the design guidelines are finalized, our F&amp;C department is responsible for disseminating them across the college community. This can include conducting workshops, training sessions, and presentations to ensure that all relevant parties are aware of and understand the guidelines.<\/li>\n<li><strong>Enforcement and Compliance:<\/strong><br \/>Our F&amp;C department plays a key role in ensuring that all construction and renovation projects adhere to the established design guidelines. This involves reviewing and distributing project plans, and specifications throughout stakeholders to confirm compliance. If necessary, our team may provide guidance to project teams (architects\/engineers) to align their work with the guidelines.<\/li>\n<li><strong>Feedback and Improvement:<\/strong><br \/>Our F&amp;C department encourages input from project teams and stakeholders through a feedback loop. This input can help identify areas where the guidelines might need clarification or improvement, leading to continuous refinement of the guidelines.<\/li>\n<\/ol>\n<p>Overall, our Facilities and Construction department&#8217;s role in gathering and maintaining college design guidelines is crucial for maintaining a cohesive and well-designed campus that aligns with the college&#8217;s vision and provides a conducive environment for learning and growth.<\/p>\n<\/p>\n<\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<div class=\"wp-block-buttons is-content-justification-left is-layout-flex wp-container-core-buttons-is-layout-fdcfc74e wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background has-text-align-center wp-element-button\" href=\"https:\/\/acrobat.adobe.com\/id\/urn:aaid:sc:US:31a44c50-7fbc-4d87-b47b-97c054992ca9\" style=\"background-color:#4f2682\" target=\"_blank\" rel=\"noreferrer noopener\">Design Guidelines and Construction Standards Rev04-2025<\/a><\/div>\n<\/div>\n<div style=\"height:34px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Divisions<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<h2 class=\"wp-block-heading\">Individual Divisions<\/h2>\n<div class=\"wp-block-buttons has-custom-font-size has-medium-font-size is-vertical is-content-justification-left is-layout-flex wp-container-core-buttons-is-layout-b53ef676 wp-block-buttons-is-layout-flex\" style=\"font-style:normal;font-weight:300\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 00 Introduction \/ Professional Service Requirements<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 01 General Requirements<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 03 Concrete Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 04 Masonry Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 05 Metals Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 06 Wood Plastics Composites Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 07 Thermal Moisture Protection Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 08 Openings Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 09 Finishes Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 10 Specialties Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 13 Special Construction Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 21 Fire Suppression Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 22 Plumbing Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 23 HVAC Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 25 Building Automation System Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 26 Electrical Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 27 Communications Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 27 TLED AV Building Standards<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 28 Electronic Safety Security Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 31 Earthwork Guidelines<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">DIV 32 Exterior Improvements Guidelines<\/a><\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Appendix A<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<h2 class=\"wp-block-heading\">Standard Specifications<\/h2>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-buttons has-custom-font-size has-medium-font-size is-vertical is-content-justification-left is-layout-flex wp-container-core-buttons-is-layout-b53ef676 wp-block-buttons-is-layout-flex\" style=\"font-style:normal;font-weight:300\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 01<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 03<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 07<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 08<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 21<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 22<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 23<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 25<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 26<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 27<\/a><\/div>\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Appendix A Division 28<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Appendix B<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<h2 class=\"wp-block-heading\">ACC Approved Manufacturers<\/h2>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-buttons is-content-justification-left is-layout-flex wp-container-core-buttons-is-layout-fdcfc74e wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background wp-element-button\" style=\"background-color:#4f2682\">Approved Manufacturers<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"list\"><p class=\"trigger\"><a href=\"#\">Appendix C<\/a><\/p><div class=\"toggle_container\"><div class=\"block\"><\/p>\n<h2 class=\"wp-block-heading\">SEM Forms<\/h2>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-text-align-center has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">Safe Work Plan Sample<\/a><\/div>\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--2\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">Safety Audit Sample<\/a><\/div>\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--3\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">Chemical Register Sample<\/a><\/div>\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--4\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">JHA Non-Routine Sample<\/a><\/div>\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--5\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">JHA Routine Sample<\/a><\/div>\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--6\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">ACC Lockout-Tagout Procedure<\/a><\/div>\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-outline is-style-outline--7\"><a class=\"wp-block-button__link has-white-color has-text-color has-background has-link-color has-small-font-size has-custom-font-size wp-element-button\" style=\"background-color:#4f2682\">Hot Work Permit Form<\/a><\/div>\n<\/div>\n<p><\/div><\/div><\/div>\n<\/p><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>ACC Design Guidelines and Construction Standards have been created as the foundation for the design, construction, operation, renovation, modification and general care of our facilities at Austin Community College District (ACC).&nbsp;<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":69,"menu_order":-35,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-24","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/24","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/comments?post=24"}],"version-history":[{"count":0,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/24\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/media?parent=24"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}