{"id":15,"date":"2023-10-30T14:15:15","date_gmt":"2023-10-30T14:15:15","guid":{"rendered":"https:\/\/offices.austincc.edu\/facilities-and-construction\/?page_id=15"},"modified":"2024-01-03T19:13:19","modified_gmt":"2024-01-03T19:13:19","slug":"master-planning","status":"publish","type":"page","link":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/campus-planning\/master-planning\/","title":{"rendered":"Master Planning"},"content":{"rendered":"<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-group\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1095\" height=\"1094\" src=\"https:\/\/offices.austincc.edu\/facilities-and-construction\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited.jpg\" alt=\"\" class=\"wp-image-207\" style=\"aspect-ratio:1.0009140767824498;width:840px;height:auto\" srcset=\"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited.jpg 1095w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited-300x300.jpg 300w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited-1024x1024.jpg 1024w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited-150x150.jpg 150w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited-768x767.jpg 768w, https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-content\/uploads\/sites\/32\/2023\/12\/Hays-Site_Page_2-edited-250x250.jpg 250w\" sizes=\"auto, (max-width: 1095px) 100vw, 1095px\" \/><\/figure>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2 class=\"wp-block-heading\">Feasibility Studies<\/h2>\n<ul class=\"wp-block-list\">\n<li>Analyze code compliance, Mechanical, Electrical, and Plumbing Systems, roofing and building envelope assessments, structural systems, ADA\/TDLR, and Life Safety requirements<\/li>\n<\/ul>\n<h2 class=\"wp-block-heading\">Individual Campus Master Plans<\/h2>\n<ul class=\"wp-block-list\">\n<li>Analyze zoning, codes, jurisdictional development requirements, and the availability of utilities and public transportation&nbsp;<\/li>\n<li>Identify the intended focus and instructional programs at the proposed campus<\/li>\n<li>Analyze existing site conditions &amp; identify site development guidelines<\/li>\n<li>Conceptualize the building mass on site and demonstrate how the physical relationships of the buildings optimize site usage<\/li>\n<li>Communicate needs and priorities of ACC that will act as a framework for future planning and coordinating with potential partnerships<\/li>\n<li>Estimate the cost of work for an initial phase of construction<\/li>\n<li>Incorporate the input and vision of&nbsp; ACC departmental user groups, the Administration, Regional Advisory Committee, non-ACC partners, and the ACC Board of Trustees&nbsp;<\/li>\n<li>Ensure the master plan aligns with both the mission and vision of ACC and the strategic and academic plans of the Austin Community College District.<\/li>\n<\/ul>\n<p class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:900\"><a href=\"https:\/\/drive.google.com\/file\/d\/1-cxV2VWNFSjVWYMKGY0bts4s5NdQ_2sm\/view\"><strong>Master Plan: Southeast Travis County, A Workforce Campus<\/strong><\/a><\/p>\n<h2 class=\"wp-block-heading\">District wide campus planning<\/h2>\n<ul class=\"wp-block-list\">\n<li>To incorporate their input and vision, meetings with ACC departmental user groups, Administration, community engagement groups, Regional Advisory Committee, non-ACC partners, and ACC Board of Trustees are scheduled.<\/li>\n<li>Master plans are evaluated to ensure they align with both the mission and vision of ACC and the strategic and academic plans of the Austin Community College District.<\/li>\n<li>Zoning restrictions, environmental impacts and controls, the provision of utilities and transportation, and demographic data are all updated.<\/li>\n<li>The intended focus and instructional programs for each campus and at administrative facilities are carefully examined.&nbsp;<\/li>\n<li>The uses of spaces, both building and site, are specifically identified.<\/li>\n<li>New construction and major renovation projects are prioritized to address known deficiencies and meet the functional needs identified during the planning process.<\/li>\n<li>Logistical issues needed to implement planning are evaluated. The focus is on both short term and long term development.&nbsp;&nbsp;&nbsp;<\/li>\n<li>The cost of work to implement the short term phase of construction at each campus is estimated.<\/li>\n<\/ul>\n<p class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:900\"><a href=\"https:\/\/drive.google.com\/file\/d\/1DxCgDbqq349Vhm6Oj_UM3lrsWOikUgrE\/view\" target=\"_blank\" rel=\"noreferrer noopener\">2021 Campus Masterplan Vol 1 (Rev1.2023)<\/a><\/p>\n<p class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:900\"><strong><a href=\"https:\/\/drive.google.com\/file\/d\/1WBMpj3yu1Pqc0mphceKw2rOR5UFdHmER\/view\" target=\"_blank\" rel=\"noreferrer noopener\">2021 Campus Masterplan Vol 2<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Feasibility Studies Individual Campus Master Plans Master Plan: Southeast Travis County, A Workforce Campus District wide campus planning 2021 Campus Masterplan Vol 1 (Rev1.2023) 2021 Campus Masterplan Vol 2<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":69,"menu_order":-50,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-15","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/15","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/comments?post=15"}],"version-history":[{"count":0,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/15\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/offices.austincc.edu\/campus-planning-construction-and-sustainability\/wp-json\/wp\/v2\/media?parent=15"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}